SELF-COMSUMPTION
100 kW

1700 m2 minimum area required

4 Trackers
216 Modules
1 Inverter
Communications cabinet Mini control SCADA: PV Plant Monitorization
Anemometer Documentation package: Blueprints, procedures and guides

  • Same equipment from large-scale plants now for self-consumption
  • Early repayment*
  • Shared self-consumption
  • Eligible product
  • Greater Yield: 14-20% vs fixed-tilt or rooftop
  • Minimizes civil works
  • All-in-one: fast and easy with certified local installers
  • Locally manufactured steel components

* Repayment 5-10 years, 3-6 years with grants up to 40-60%. Indicated repayment periods are a guidance which mainly depend on client consumption profile and specific installation output.